40 MW AI GPU data center with on-site generation Phase 2 in progress
40 MW IT · 40 MW on-site generation · NVIDIA GB300 and Vera Rubin · 415Y/240V distribution
A 40 MW data center in the Northeast built for NVIDIA GB300 and Vera Rubin platforms and powered by 40 MW of on-site generation. Cooling combines rack-mounted CDUs and rear-door heat exchangers on a technology cooling system loop, fed by a tempered chilled water loop and air-cooled chillers. The first 16 MW phase was completed in 2026. The 24 MW second phase is scheduled for delivery in 2027.
RoleEngineer of Record